Free Project Risk Register: Risk Register with Likelihood and Impact Scores, 5x5 Risk Matrix, and a Risk Response Plan (PDF, Word, Excel)

Every project has things that might go wrong. The ones that hurt are the ones nobody wrote down, so nobody watched for the warning signs or prepared a plan. A risk register lists each risk, scores it by how likely it is and how bad it would be, and gives it an owner and a response. The 5x5 matrix shows at a glance which risks deserve attention. The response plan turns the top risks into actions with a cost, so the decision to spend money reducing a risk is a deliberate one.

Formats
PDF, Word, Excel, ODT, ODS
Paper
US Letter and A4
Fillable
Yes, with totals

Updated November 9, 2026

Filled-in example of the Risk register with scores design
Filled-in example: Risk register with scores. The downloads are blank and fillable.

Choose a design

3 Project Risk Register designs, each in five file formats

Every design comes as a fillable PDF for US Letter and A4, a Word document and an Excel workbook. OpenDocument versions (ODT, ODS) are the same layouts for LibreOffice and OpenOffice users.

Risk register with scores - filled-in example

Risk register with scores

Each risk with its cause and effect, likelihood and impact on a 1 to 5 scale, the score Excel works out (likelihood x impact), owner, response, early warning sign and status. Landscape.

OpenDocument: ODT · ODS

5x5 risk assessment matrix - filled-in example

5x5 risk assessment matrix

Likelihood down the side and impact across, each box already showing its score and rating (low, medium, high). Write the risk IDs in the right box to see your project's risk picture on one page, with the scales explained.

OpenDocument: ODT · ODS

Risk response plan - filled-in example

Risk response plan

For the top risks: the score now, the strategy (avoid, reduce, transfer or accept), the actions, their cost, owner and due date, and the expected score after the response. Excel totals the cost of the responses. Landscape.

OpenDocument: ODT · ODS

All files are free for personal, household, classroom and internal business use. The PDFs are fillable in Adobe Reader, Chrome, Edge, Firefox and Preview; they do not calculate totals. The Excel files calculate line amounts and totals for you.

What is on the project risk register

Risk statement
Written as "if [cause], then [effect]", which makes it clear what could happen and why. "Contractor" is not a risk; "if the contractor is unavailable in April, the build slips" is.
Likelihood and impact
Each scored 1 to 5 using the scales on the matrix page. Excel multiplies them into a score from 1 to 25.
Owner and warning sign
One person who watches the risk, and the early sign that it is starting to happen.
Strategy
Avoid (change the plan so it cannot happen), reduce (lower the likelihood or impact), transfer (insurance, contract, specialist) or accept (watch and keep a contingency).
Score after
The expected score once the response is in place, which shows whether the spending is worth it.

Identifying risks

Hold a short risk session at the start of the project with the whole team, and ask: what could stop us delivering on time, on budget, or to the quality we promised? Think through categories (schedule, cost, technical, people, suppliers, quality, compliance, business) and look at what went wrong on similar projects. Write each risk as "if... then..." and put it on the register. Expect ten to twenty risks on a small project. Then score them. Revisit the register every week or two; new risks appear and old ones fade.

Scoring with likelihood and impact

Score each risk from 1 to 5 for likelihood and 1 to 5 for impact, using the definitions on the matrix sheet so everyone scores the same way. The score is the two multiplied: 15 and above is high, 8 to 14 medium, 7 and below low. Write the risk IDs into the matrix to see the overall picture: a project with several risks in the top-right corner needs the sponsor's attention before it starts. Scores are judgments, not measurements; their value is in making the team discuss and agree them.

Planning responses

For each high and medium risk, choose a strategy and specific actions. Reducing a risk often costs little (a review step, a test, a backup person); transferring it costs a fee (insurance, a specialist, a fixed-price contract); avoiding it may change the scope. Put a cost on each response and compare it with the score after: in the sample, about $850 of responses brings the four biggest risks down to medium or low. Keep a contingency budget for the risks you accept. When a risk actually happens, move it to the issue log and act on the plan.

Reporting risks

Show the top three to five risks and their trend in the weekly status report, and tell the sponsor immediately when a risk becomes high. Record the risk-related decisions in the decision log. At the end of the project, note which risks happened and which responses worked, for the next project.

Editing the files

The PDFs are fillable. The Excel register calculates scores and can be sorted by score so the biggest risks are at the top. The matrix scores and ratings are printed in every format; change the scale descriptions in Word to fit your organization.

Questions

What is a risk register?

A list of project risks with a description, likelihood, impact, score, owner, response, warning signs and status, reviewed regularly during the project.

How is a risk score calculated?

Likelihood (1 to 5) multiplied by impact (1 to 5), giving a score from 1 to 25. Higher scores need more attention.

What is a 5x5 risk matrix?

A grid with likelihood on one side and impact on the other, where each box shows the combined score and whether it is low, medium or high.

What are the four risk response strategies?

Avoid, reduce (mitigate), transfer, and accept. Some frameworks add escalate for risks outside the project's control.

How often should the risk register be reviewed?

Weekly or every two weeks on most projects, and whenever something significant changes.

Related printables

Templates that go with this one

Documents from the same workflow. Each has its own designs and file formats.

How useful was this template?

Tap a star to rate it. Your rating helps other people pick a template.

Comments and questions

Have a question about this template, or an idea to make it better? Leave a comment.

Leave a comment

Comments are checked before they appear, usually within a day or two. Please keep personal details out of your comment.